The basic level should be flat, dry, and clean. If the ground floor or bungalows are laid, they shall be waterproofed. The floor must be cleaned before laying it.
2. Direction of paving
Pavement direction should be explained and determined with the customer, as far as the possible smooth direction of laying, that is, the direction of laying vertical to the window. Benefits: the floor extends along with the sunlight, strengthens the spatial depth feeling, and the visual sense is more open.
3. Floor coverings
Now spread Pearl Cotton: choose more than 2mm Pearl Cotton, cotton and cotton alignment between do not repeat, the interface with waterproof adhesive tape paste seal, around 5 cm margin against the wall; if for solid wood skirting line, the wall should be more than 5 cm.
4. Lay the floor
Experiment with different 7mm waterproof laminate flooring patterns to see the effect; install the first row of the floor from the door side of the room, leaving a 4-10mm extension seam between the wall and flooring; Installation method"First long after short, first press after push".
5. Install a baseboard
A skirting line should be pressed around the film surplus and the excess of the film with a blade crossed out, installation must be done when the foot can not fall off the phenomenon.
6. Install the buckle
First need to determine the location of the buckle by installation, measuring the size. Fasten the fastener vertically to the door cover and tighten the screws.